Skip to content

IT & Data Center

Data Center Decommissioning — Dallas–Fort Worth and Statewide Texas

Rack-to-slab decommissioning with serialized chain of custody, NIST SP 800-88 sanitization, and reporting your auditor will accept.

A decommission is a logistics project wrapped around a security problem. Racks have to come out on a schedule someone else set, on a floor you have to hand back clean, while every data-bearing device in the room stays accounted for from the moment it is unracked to the moment it is destroyed.

We run the whole scope from our Arlington facility: audit, de-rack, sanitize or destroy, haul it back, shred it on our own equipment, recover the materials, and hand you a serialized report that reconciles against your asset register.

What we take out

  • Servers, blades and chassis
  • Storage arrays, SANs, JBODs and tape libraries
  • Network switches, routers, firewalls and load balancers
  • Racks, cabinets, cages and containment
  • UPS systems, PDUs and battery strings
  • CRAC and CRAH units, in-row cooling
  • Structured cabling, fiber and copper trunks
  • Generators, switchgear and electrical infrastructure
  • Raised floor and support structure

The decommission sequence

  1. Discovery and audit

    Site walk, rack elevations, asset counts, data-bearing device inventory, access and dock constraints, union and escort requirements, target dates.

  2. Statement of work

    Scope, method per media type, staffing, schedule, material recovery estimate and net position. Approved before anyone touches a rail.

  3. Data sanitization

    NIST SP 800-88 Rev. 2 Clear, Purge or Destroy — selected per media type. On-site destruction available where policy requires media never to leave the building.

  4. De-rack and removal

    Systematic teardown, scanned and logged at the point of removal, palletized and sealed for transport.

  5. Transport under custody

    Documented custody transfer, GPS-tracked vehicles, sealed loads.

  6. Shredding and materials recovery

    Hardware is destroyed on our own industrial shredder and separated into recoverable material streams under R2v3 — not brokered on to a third party.

  7. Reporting

    Serialized asset report, Certificates of Destruction, settlement statement and environmental diversion figures.

Why TDR for a Texas decommission

R2v3 and NAID AAA

Both certifications, not one. R2v3 governs the recycling chain; NAID AAA governs the destruction of the data.

A Texas facility, not a Dallas landing page

Several firms ranking for "data center decommissioning Dallas" have no Texas presence at all. Our yard is in Arlington. You can visit it.

Serialized chain of custody

Every data-bearing device tracked individually from rack to destruction, reconciled against your asset register.

We shred it ourselves

Our Arlington facility runs its own industrial shredder. Your hardware is destroyed here, under our certifications, not handed to an unnamed downstream.

Data Center Decommissioning — common questions

What is data center decommissioning?

The controlled removal of IT and supporting infrastructure from a facility or a portion of one — auditing what is there, sanitizing or destroying every data-bearing device, de-racking and removing hardware, processing it for materials recovery, and documenting the whole chain so the organization can prove what happened to each asset.

How long does a data center decommission take?

Driven by scale, access and data-handling requirements. A single cage or a small server room is usually days. A full data hall runs weeks. On-site destruction, escort requirements, restricted dock hours and after-hours-only access all extend the schedule — which is why the discovery phase exists.

How much does data center decommissioning cost?

It is a net number, not a gross one. Labor, logistics, destruction and processing are costs; the recoverable material in the hardware is a credit against them. Copper-dense infrastructure — cabling, bus, transformers, UPS plant — moves the number in your favour. Light, low-metal equipment generally carries a net cost. We quote both sides explicitly before anything moves.

Can drives be destroyed on site?

Yes. We bring shredding and degaussing equipment to your facility so media is destroyed before it leaves the building, with your representative witnessing. This is the standard for organizations whose policy prohibits data-bearing media leaving the premises intact.

What documentation do we receive?

A serialized asset report listing every tracked device with make, model, serial number and final disposition; Certificates of Destruction for data-bearing media; a settlement statement for recovered materials; and an environmental diversion report. Audit-ready as delivered.

Do you work outside DFW?

Yes — Houston, Austin, San Antonio and the rest of Texas. DFW is our home market and gets the fastest mobilization.

Tell us what you have.

Send photos, a nameplate, a rack count or an asset list. You will get a written response from a person who has read it — within one business day, usually the same day.

Certified & registered — what each one covers

R2v3 — Sustainable Electronics Reuse & Recycling Standard, Version 3NAID AAA Certification — Information DestructionISO 9001:2015 — Quality Management SystemsISO 14001:2015 — Environmental Management SystemsISO 45001:2018 — Occupational Health & Safety Management